Western Region Projects

Eastside Phase 2

Project Description:

Los Angeles, CA - Metro began preparing the Draft EIS/EIR for the Eastside Transit Corridor Phase 2 Project. This study evaluates the two build alternatives, State Route 60 Light Rail Transit (LRT) and Washington Bl LRT, along with the required No Build and Transportation System Management (TSM) alternatives.

source: metro.net

LKG Scope of Work:

LKG was retained by the Alternatives Analysis, environmental clearance and conceptual engineering consultant to provide services in:

  • Document control

  • Project controls

  • Scheduling

  • Meeting minute development

  • Database development and policies and procedures