West Coast Projects

East Link LRT
Seattle to South Bellevue

Project Description:

East Link Extension will give riders a fast, frequent and reliable connection from the Eastside's biggest population and employment centers to downtown Seattle, Sea-Tac Airport and the University of Washington. Ten stations will serve Seattle, Mercer Island, Bellevue, Bel-Red and Overlake in Redmond.

source: soundtransit.org

LKG Scope of Work:

LKG was retained by the final design consultant, to provide project controls services. LKG responsibilities include:

  • Assist the Project Manager in developing, implementing, and using procedures and systems that provide cost and schedule information and forecasts required for proper coordination and control of operations.
  • Oversee the development, maintenance and revision of a Critical Path Method (CPM).
  • Prepare and maintain a Summary of Hours and Summary of Dollars.
  • Establish, maintain, and use a performance management system or Earned Value Management System (EVMS) using ANSI/EIA-748-B.